Barge Loading

SRRQ has begun to supply rip rap to various projects in the Sacramento River Delta, including the Army Corps of Engineers Sacramento River Erosion Control Project 2 and the Brannan Andrus levee maintenance project. These projects involve placement of rip rap to shore up existing levees and protect critical infrastructure. The materials provided to these projects will be supplied via barge. Barge loading will continue until approximately October 31st, 2023. Evening and Saturday loading may be required to meet the project’s schedule. All loading will be done in accordance with COA #32.